Greenguy's Board


Go Back   Greenguy's Board > General Business Knowledge
Register FAQ Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 2009-01-10, 08:13 PM   #1
Tommy
NYC Boy That Moved To The Island
 
Join Date: Apr 2003
Posts: 2,940
Send a message via ICQ to Tommy
Juggling Time Between projects ??

when you find yourself with a few things you wanna work on

will you just work on one at a time and stay the course until one is finished or ???

does any one have any good tips for managing time on different projects

I tend to stick my head in the sand and keep going on one thing ignoring everything and everybody but thats not really the most profitable way and I tend to burn out that way pretty quick
__________________
Accepting New partners
Tommy is offline   Reply With Quote
Old 2009-01-10, 09:18 PM   #2
ponygirl
on vacation
 
ponygirl's Avatar
 
Join Date: Sep 2004
Posts: 2,095
Send a message via ICQ to ponygirl
I get bored easily, so if I just did one thing all day it would end up being rather unproductive because I'd constantly find other things distracting me. I find the best way is to have 2 or 3 different kinds of things going at once; going back and forth between them keeps me interested, but it's not so much that I feel overwhelmed.

I do, however, have to have structure within that, so I'll block out what I'm doing either by chunks of work; for example do 2 pages on the LL then move to something else for a while, or time - spend 1 hr doing this then switch to that. Setting self-imposed deadlines is a good way to keep things flowing too - try giving yourself a little treat when you've finished a project/met a deadline to give you some incentive. Chocolate usually works for me

When I'm really engrossed in something however, that all goes out the window

You have to have some flexibility to fit in the everyday stuff too, because if you just ignore everyone they'll think you don't like them anymore or have forgotten them or something
ponygirl is offline   Reply With Quote
Old 2009-01-10, 09:55 PM   #3
Cleo
Subversive filth of the hedonistic decadent West
 
Cleo's Avatar
 
Join Date: Mar 2003
Location: Southeast Florida
Posts: 27,936
I break my projects down into smaller chunks and then do a chunk of each project each day and often I have about a half dozen projects being worked on each day.
__________________
Free Rides on Uber and Lyft
Uber Car: uberTzTerri
Lyft Car: TZ896289
Cleo is offline   Reply With Quote
Old 2009-01-10, 10:34 PM   #4
bDok
bang bang
 
bDok's Avatar
 
Join Date: Mar 2005
Location: SD/OC/LA
Posts: 3,241
Send a message via ICQ to bDok
Quote:
Originally Posted by Cleo View Post
I break my projects down into smaller chunks and then do a chunk of each project each day and often I have about a half dozen projects being worked on each day.
This is generally the way I work. However, at times I will admit it can delay certain milestones in a project. (just because another project I might just feel like working on at that point in time. It's one thing in this coming year I need to get better on in regards to priority.)

The biggest thing I've done over the past year is actually write down items into manageable action items. This allows me to just look at my projects and know exactly things I can do that move things forward towards the completion goal.
__________________
submit to Nymphotic
submit to Moistlace
bDok is offline   Reply With Quote
Old 2009-01-10, 10:40 PM   #5
Star Man
A boy without mischief is like a bowling ball without a liquid center
 
Star Man's Avatar
 
Join Date: Feb 2006
Location: clevel.......don't make me say it!
Posts: 436
I force myself to first do things that will most likely make me money,like submitting and building a few sites.Once thats done,I work on other less important things like cropping,naming galleries etc.

Theres been days where I get all nuts and hit one task really hard but I get burnt out fast.
__________________
good luck
Star Man is offline   Reply With Quote
Old 2009-01-11, 12:57 AM   #6
MadCat
If something's hard to do, then it's not worth doing
 
MadCat's Avatar
 
Join Date: Sep 2008
Location: Berlin, Germany
Posts: 247
I tend to have, in general, 2 to 3 projects on the burner at any given time, although my way of working is quite different from most people. I'll get all "current" projects to a state where I can throw up a 'coming soon' page. After that I find the project that is most likely to keep me entertained while working on it, and finish that. Rinse, repeat.
__________________
What's blue and not heavy?
MadCat is offline   Reply With Quote
Old 2009-01-11, 01:14 AM   #7
comm
A woman is like beer. They look good, they smell good, and you'd step over your own mother just to get one!
 
Join Date: Apr 2005
Posts: 54
i tend to focus on just 1 project and ignore the rest
comm is offline   Reply With Quote
Old 2009-01-11, 01:25 AM   #8
secretagentwilly
You can now put whatever you want in this space :)
 
secretagentwilly's Avatar
 
Join Date: Sep 2005
Location: Los Angeles, California
Posts: 637
I'm over worked and under paid...I typically have too many projects going on at one time...I'm trying to manage that better by letting go some of the domain names that i have and just trim down the fat to a few projects I can make more lucrative...
secretagentwilly is offline   Reply With Quote
Old 2009-01-11, 01:27 AM   #9
Toby
Lonewolf Internet Sales
 
Toby's Avatar
 
Join Date: Mar 2005
Location: Houston
Posts: 4,826
Send a message via ICQ to Toby
I do much that same as Cleo, divide and conquer.

If I'm in the middle of a major project that requires serious focus I try to get all my routine chores handled first thing each day so I don't have to worry about them if I get on a roll and don't want to stop.
Toby is offline   Reply With Quote
Old 2009-01-11, 02:40 AM   #10
tickler
If there is nobody out there, that's a lot of real estate going to waste!
 
tickler's Avatar
 
Join Date: Dec 2003
Posts: 2,177
I jot everything down on stick-it notes and put them on a blank wall in a general order that they need to be done.

Generally I have 5-6 on the go at a time. As I finish one or get hung up, I grab another one.
__________________
Latina Twins, Solo, NN, Hardcore
Latin Teen Cash
tickler is offline   Reply With Quote
Old 2009-01-11, 08:42 AM   #11
Twiceshy
You can now put whatever you want in this space :)
 
Twiceshy's Avatar
 
Join Date: Apr 2003
Location: Canada
Posts: 958
Send a message via ICQ to Twiceshy
Myself i usually have about 6 or so on the go and bounce between them but i also can get to involved in one and forget everything else .I try to focus more but thats also a work in progress .
Twiceshy is offline   Reply With Quote
Old 2009-01-11, 12:09 PM   #12
Mike-mijen
What do you mean, my birth certificate expired?
 
Mike-mijen's Avatar
 
Join Date: Aug 2004
Location: Fla
Posts: 995
Send a message via ICQ to Mike-mijen
I try to work on the things that will make money first and then on the projects I have on the burner warming. I can lose track of time easy working when I am not interrupted my family(LOL).
Mike
Mike-mijen is offline   Reply With Quote
Old 2009-01-11, 01:08 PM   #13
pc
Shift Out / X-On
 
pc's Avatar
 
Join Date: Jul 2007
Location: unknown
Posts: 2,298
Send a message via ICQ to pc
Quote:
Originally Posted by Cleo View Post
I break my projects down into smaller chunks and then do a chunk of each project each day and often I have about a half dozen projects being worked on each day.
This is what I do too.Brake things in smaller pieces and work on them with small steps.
pc is offline   Reply With Quote
Old 2009-01-11, 01:55 PM   #14
SheepGuy
It's the end of the world as we know it, and I feel fine
 
SheepGuy's Avatar
 
Join Date: Jul 2006
Location: Canada
Posts: 2,527
I usually have 3 or 4 things on the go. I do the routine things first to get it over with, then I'll spend a few hours on one thing, a few hours on the next, etc.
The most time I can spend doing just one thing is about 4 hours before I go bonkers.
__________________
If the Environment was a bank, they would have saved it by now.
SheepGuy is offline   Reply With Quote
Old 2009-01-11, 04:15 PM   #15
HowlingWulf
Me fail English? That's unpossible!
 
HowlingWulf's Avatar
 
Join Date: Dec 2003
Location: FL
Posts: 1,381
Send a message via ICQ to HowlingWulf
I have a todo list next to the keyboard that helps keep me going, and I try to multitask when possible.
__________________
WordPress Porn directory theme => Maddos
Create a Porn Tube => Video Pornster
HowlingWulf is offline   Reply With Quote
Old 2009-01-11, 04:24 PM   #16
NY Jester
ICQ:147*079*406
 
NY Jester's Avatar
 
Join Date: Oct 2007
Location: Rock*ME*Hardplace
Posts: 2,996
Send a message via ICQ to NY Jester Send a message via AIM to NY Jester
I usually have 1 too many things going on and what I have found makes it easier is to block out time. Or set a goal that you want to finish for that project and work on it that way. Im sure much like everyone else, I get distracted and have to get myself back on track..but I think the key no matter what is to do something no matter how small you may feel it is. Every little bit helps.
__________________
The Sexy Side of Porn
NY Jester is offline   Reply With Quote
Old 2009-01-11, 06:23 PM   #17
SheepGuy
It's the end of the world as we know it, and I feel fine
 
SheepGuy's Avatar
 
Join Date: Jul 2006
Location: Canada
Posts: 2,527
Quote:
Originally Posted by NY Jester View Post
I usually have 1 too many things going on and what I have found makes it easier is to block out time. Or set a goal that you want to finish for that project and work on it that way. Im sure much like everyone else, I get distracted and have to get myself back on track..but I think the key no matter what is to do something no matter how small you may feel it is. Every little bit helps.
Absolutely! I just try to make sure I get at least one damn thing done every day that will/should/could boost or at least maintain my income.
__________________
If the Environment was a bank, they would have saved it by now.
SheepGuy is offline   Reply With Quote
Old 2009-01-11, 06:41 PM   #18
Bill
Selling porn allows me to stay in a constant state of Bliss - ain't that a trip!
 
Join Date: Apr 2003
Posts: 3,914
Procrastination is my favorite technique.

Followed closely by fucking off and wasting time surfing.

If I really have an important project, I consider renting a video game.

When that fails, I jerk off.
Bill is offline   Reply With Quote
Old 2009-01-12, 01:03 AM   #19
Maj. Stress
Progress rarely comes in buckets, it normally comes in teaspoons
 
Maj. Stress's Avatar
 
Join Date: Jun 2005
Location: Dark Side Of Naboo
Posts: 1,289
This thread has actually got me thinking. After some thought, I have a new plan of attack on my projects that will hopefully get them completed ahead of time.

Thanks to Tommy for starting it, and all those who replied to him.

It's threads like this that sets this board and it's members apart from that other place.
Maj. Stress is offline   Reply With Quote
Old 2009-01-12, 08:28 AM   #20
stuveltje
Live and learn. And take very careful notes!
 
stuveltje's Avatar
 
Join Date: Apr 2003
Location: Sunny Holland
Posts: 6,157
Send a message via ICQ to stuveltje
i always worked on several projects at the same time, my problem only was i started in the meantime again new projects and ofcourse the projects which take me years to get finished because i am never satisfied on what i do with them (to much projects to many distractions cant get my time in balance anymore to get them finished at the same time). My new rule from some years ago is......start only one project, focus on that one and start a new one if the other one is finished.....it works much better...for me
stuveltje is offline   Reply With Quote
Old 2009-01-12, 11:15 AM   #21
RedCherry
Of all the things I've lost, I miss my mind the most.
 
RedCherry's Avatar
 
Join Date: Apr 2004
Location: Middle of the Desert, Pahrump, NV
Posts: 3,187
Send a message via ICQ to RedCherry
I tend to break mine down into what I need to do daily...submit 3 galleries for instance...and try to get that done first and out of the way.

Then after that, I may pick a job to do on a daily basis. For instance, I tend to work on my eBay stuff on Sundays, as that is the best day to start/stop auctions.

Today, I need to get up an AVS site that is almost ready to submit, that I didn't work on over the weekend, since they wouldn't review it anyways.

Like several posted, I also tend to work on the stuff that is going to make me money first. Unfortunately, other projects tend to suffer because of it. And I'm REALLY ADD with two monitors, I get distracted easily, so it helps if every project is in smaller chunks so I can finish it and move on to the next.

I have a little weekly calender book and I track what I do daily on projects in it. It helps me see things like what sites I submitted galleries for last, what I worked on, oh yea forgot that insn't finished, etc.
RedCherry is offline   Reply With Quote
Old 2009-01-12, 12:55 PM   #22
carol.prime
Asleep at the switch? I wasn't asleep, I was drunk
 
carol.prime's Avatar
 
Join Date: Jul 2006
Posts: 211
Quote:
Originally Posted by Bill View Post
Procrastination is my favorite technique.

Followed closely by fucking off and wasting time surfing.
When that fails, I jerk off.


Well, I tend to manage all my job and finish it on time because I have a timesheet to follow. My boss gives me several things to do and I used to divide the tasks within the period given so I can make sure that I can finish it on the right time.
__________________
Prime Outsourcing icq. 309570461
carol.prime is offline   Reply With Quote
Old 2009-01-12, 12:59 PM   #23
stuveltje
Live and learn. And take very careful notes!
 
stuveltje's Avatar
 
Join Date: Apr 2003
Location: Sunny Holland
Posts: 6,157
Send a message via ICQ to stuveltje
i have to say....working on projects also depends on this: do you have a wife or a hubby and do you have kids, they need attention too, so that is and was my problem too, hubby and 2 kids and all my projects....try to get a balance between fam and get all your projects going, nop do it like this, start only one project and balance that with the fam too, that way is much easier
stuveltje is offline   Reply With Quote
Old 2009-01-12, 11:20 PM   #24
SirMoby
Jim? I heard he's a dirty pornographer.
 
SirMoby's Avatar
 
Join Date: Aug 2003
Location: Washington, DC
Posts: 2,706
I haven't been as productive as I'd like the past year so I've been thinking about getting a new Franklin Planner. I used to live by one in my former career so much that my old boss would fuck with me by stealing it, then call me into an unexpected meeting. After 5minutes of paging me I'd walk into a room full of laughing people with my planner on the table.

I think I need it again. Then 3 times a day I'll go through my to do list. Once to start the day, once around lunch to review how I'm doing and again at the end of the day to make up tomorrow's list.

When editing code or doing design I'm terrible and have to shut things out but a lot of my day could be better spent.
__________________
Make Serious Money With Hungarian Honeys From NS Cash
SirMoby is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:04 AM.


Mark Read
Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
© Greenguy Marketing Inc