|
|
|
|
|
|
![]() |
#1 |
Subversive filth of the hedonistic decadent West
Join Date: Mar 2003
Location: Southeast Florida
Posts: 27,936
|
![]() A couple of before and after pics of my house. Monday will be a big day as they are going to start replacing the ceiling in my bedroom and moving all the pipes and electrical out of the way in my kitchen. Not sure when they will finish my roof but at least it doesn't leak anymore.
|
![]() |
![]() |
![]() |
#2 |
Shut up brain, or I'll stab you with a Q-tip!
|
Wow the difference in the shower is great! Can't wait to see the new kitchen!
|
![]() |
![]() |
![]() |
#3 |
The Original Greenguy (Est'd 1996) & AVN HOF Member - I Crop Pics For Thumbs In My Sleep
|
Yes, that is a nice shitter
![]() Glad things are moving along ![]() |
![]() |
![]() |
![]() |
#4 |
Subversive filth of the hedonistic decadent West
Join Date: Mar 2003
Location: Southeast Florida
Posts: 27,936
|
Personally I think that the before and after pics from where the tree that went through my roof are the most dramatic.
With the tree New fence where the tree was The guy is here grouting the shower. ![]() The guy to haul away kitchen debris never showed up. ![]() As soon as the ceiling is replaced in my bedroom they can tile the floor and my bathroom and then I can move back into that side of the house. Kitchen cabinets take 6 to 8 weeks to get once they are ordered but they can't be ordered until the walls in the kitchen are done. After the cabinets are in then the granite people come in and make the templates for the counter tops and then that takes another 6 to 8 weeks. So I'm looking at about 5 months before my kitchen is completely done. ![]() |
![]() |
![]() |
![]() |
|
|