|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
#4 |
Subversive filth of the hedonistic decadent West
Join Date: Mar 2003
Location: Southeast Florida
Posts: 27,936
|
Personally I think that the before and after pics from where the tree that went through my roof are the most dramatic.
With the tree New fence where the tree was The guy is here grouting the shower. ![]() The guy to haul away kitchen debris never showed up. ![]() As soon as the ceiling is replaced in my bedroom they can tile the floor and my bathroom and then I can move back into that side of the house. Kitchen cabinets take 6 to 8 weeks to get once they are ordered but they can't be ordered until the walls in the kitchen are done. After the cabinets are in then the granite people come in and make the templates for the counter tops and then that takes another 6 to 8 weeks. So I'm looking at about 5 months before my kitchen is completely done. ![]() |
![]() |
![]() |
|
|