Greenguy's Board


Go Back   Greenguy's Board > Chit Chat
Register FAQ Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 2004-10-23, 03:59 PM   #1
Cleo
Subversive filth of the hedonistic decadent West
 
Cleo's Avatar
 
Join Date: Mar 2003
Location: Southeast Florida
Posts: 27,936
Personally I think that the before and after pics from where the tree that went through my roof are the most dramatic.
With the tree
New fence where the tree was

The guy is here grouting the shower.

The guy to haul away kitchen debris never showed up.

As soon as the ceiling is replaced in my bedroom they can tile the floor and my bathroom and then I can move back into that side of the house.

Kitchen cabinets take 6 to 8 weeks to get once they are ordered but they can't be ordered until the walls in the kitchen are done. After the cabinets are in then the granite people come in and make the templates for the counter tops and then that takes another 6 to 8 weeks. So I'm looking at about 5 months before my kitchen is completely done.
__________________
Free Rides on Uber and Lyft
Uber Car: uberTzTerri
Lyft Car: TZ896289
Cleo is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 05:36 AM.


Mark Read
Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
© Greenguy Marketing Inc