|
|
|
|
|
|
|
![]() |
#1 |
Subversive filth of the hedonistic decadent West
Join Date: Mar 2003
Location: Southeast Florida
Posts: 27,936
|
It is going to be very nice when it is done.
I'm really pushing everyone as I'm trying to get things done before all the holidays kick in and no one is working. The big stumbling block right now is if I can get the granite counter tops in before the holidays. They can't come in and make their templates before the kitchen cabinets are in and they take about two weeks from the time they make their templates and you go over to their warehouse and pick out your slab of stone to get them installed. My kitchen sink is installed on the underside of the counter top so no counter tops no kitchen sink. It is the most expensive chunk of rock that I've ever bought. ![]() I don't really care that much if my office and guest bedroom get done by the holidays but I sure would like a kitchen by then. |
![]() |
![]() |
![]() |
|
|